Design of an optimal structure for the IOC in compliance with current tasks of the Asset as well as future challenges associated with commissioning of a new offshore field
DetailAnalysis and an assessment of the advisability of establishing an IOC for five onshore Customer’s assets producing oil and gas in different regions of West Siberia
DetailDevelopment of the targeted management model and transformation roadmap for well servicing and workover management system considering the best international experience, prospective industry development trends and specific of the existing company management system
DetailAnalysis and optimisation of the responsibility areas of the IOC and field offices
DetailDevelopment of the detailed description down to the function level of the business processes executed by Chief engineer’s office personnel in Oil and Gas producing company
DetailThe main objective set to the Nafta Expert specialists was to develop static and dynamic models of the central processing facility of the oil/gas-condensate field
DetailDeveloping the mathematical model and performing the feasibility study of the exploration drilling options on the shallow-water license area
DetailThe study of functional and integrated planning processes at one of the largest offshore oil fields on the Russian shelf of the Caspian Sea (hereinafter - the field) was carried out by a joint project team, including specialists from Visavi Technology AS, ALMA Services Company LLC and Nafta Expert LLC. Nafta Expert was involved in the project from March to July 2020 and was responsible for interaction with Visavi Technology AS, including tasks of data collection, analysis, and translation.
DetailAll fields located on the Russian Arctic shelf are complex in terms of ice and weather conditions and require the optimization of the drilling, marine operations, and logistic technical solutions. Specific and characteristics of the Arctic shelf restrict the drilling period and the velocity of the operations and have the additional requirements for HSE what is the reason for the additional costs.
DetailBalancing between equipment integrity and reliability on the one hand and maintenance cost and schedule optimization, on the other hand, is one of the most relevant challenges of the Oil and Gas industry under the oil prices cutting. This ambitious target was set under the implementation of the Predictive maintenance information system in one of the biggest oil offshore fields on the Russian shelf of the Caspian Sea.
DetailCreated and adapted network model for complex analysis of possible issues.
DetailCommon project with Morneftegas JSC for calculation of parameters for re-equipment of offshore field based on network model.
DetailDevelopment of concept of Digital Oilfield for major national Oil and Gas company based on detailed survey of current state of all production units and scientific centers.
DetailImplementing of integrated modeling tools for two gas fields and pipeline system in Western Siberia for production optimization.
DetailCreating workflow for integrated modeling usage of two oilfields in Caspian Sea for solving day-to-day production issues.
DetailDevelopment and author's maintenance of implementation of the concept of the integrated production management for offshore fields.